COMPONENT REQUIREMENTS

Liquid-cooling quick-disconnect coupling

Liquid-cooling quick-disconnect coupling illustration
Images are illustrative; refer to the final engineering drawings and actual samples.
Liquid-cooling quick-disconnect coupling illustration
Conceptual part illustration
COMPONENT GUIDE

Liquid-cooling quick-disconnect coupling

Casting Processes

We specialize in investment casting (lost-wax casting) for copper-alloy components. Resin-coated sand casting is also available to suit different component designs and production requirements.

Material candidates

Customer specified Approved material to be defined

No default copper-casting alloy is established for this component.

The information above is for design reference only. Casting suitability is subject to the final approved design.

Component RFQ requirements

Interface definition
Provide approved connection series, mating halves, dimensions, interchangeability requirements and included body scope.
Materials and seals
Specify approved metals, coatings, seals, coolant and complete wetted-material compatibility requirements.
Connection duty
Define repeated connect/disconnect duty, service conditions and required sealing-life validation.
Leakage acceptance
Specify connected/disconnected leakage or drip criteria, test procedure and complete-product validation owner.
Cleanliness
Define particles, process residues, cleaning and protected packaging requirements.
Manufacturing feasibility
State the allowed body route, component drawings, sample plan and supplier qualification needed for each operation.

From your drawing to shipment.

Six steps, from the first drawing to delivery.

  1. Your drawings

    Share the part drawing and your material and quantity requirements.

  2. Product review

    Review the drawing and agree on the proposed casting approach.

  3. Initial tooling & samples

    Prepare the initial tooling and cast samples for review.

  4. Tooling confirmation

    Review and confirm the tooling.

  5. Series production

    Produce against the agreed product requirements.

  6. Shipment

    Prepare the castings for the agreed delivery.

Machinery and overhead cranes in the Zhiren workshop

Inside our foundry.

A closer look at the people and place behind your castings.

About Zhiren

Credentials, in full view.

Quality management, industry recognition and university cooperation. Open any document to read the original.

Zhiren ISO 9001 quality-management-system certificate

Quality management

Quality Management System Certification Certificate

ISO 9001:2015

View original
China Foundry Association standard-enterprise certificate

Industry qualification

Standard Enterprise Certificate

China Foundry Association

View original
Zhiren award for contribution to industrial-park development

Enterprise honor

Outstanding Contribution to Park Development

2025 · Nanchang High-tech Industrial Development Zone

View original
Nanchang University materials-science internship-base plaque

University cooperation

Materials Science & Engineering Internship Base

Nanchang University

View original

Open original