COMPONENT REQUIREMENTS

Flow-distribution housing

Illustrative Flow-distribution housing
Images are illustrative; refer to the final engineering drawings and actual samples.
Illustrative Flow-distribution housing
Conceptual part illustration
COMPONENT GUIDE

Flow-distribution housing

Casting Processes

We specialize in investment casting (lost-wax casting) for copper-alloy components. Resin-coated sand casting is also available to suit different component designs and production requirements.

Material candidates

UNS C81100 Cast copper

A possible manufacturing-study material only after the customer accepts a cast-copper route.

UNS C89833 Bismuth tin bronze

A low-lead alternative to consider where the customer approves the material and manufacturing route.

The information above is for design reference only. Casting suitability is subject to the final approved design.

Component RFQ requirements

Passage and port map
Supply all branches, connections, wall sections, flow directions and the approved 3D/section drawings.
Route approval
Confirm whether casting is allowed and identify the baseline machined or fabricated design for comparison.
Internal access
Define core/shell removal access, enclosed passages, inspection access and internal-surface acceptance.
Wetted compatibility
Specify coolant, loop identity, material/coating/seal set and the customer's written alloy approval.
Cleaning and leak checks
Define particle, ion and residue limits, cleaning evidence, leak method/limits and responsible parties.
Prototype decision
Set sample quantity, acceptance gates, traceability and any flow-distribution validation before production approval.

From your drawing to shipment.

Six steps, from the first drawing to delivery.

  1. Your drawings

    Share the part drawing and your material and quantity requirements.

  2. Product review

    Review the drawing and agree on the proposed casting approach.

  3. Initial tooling & samples

    Prepare the initial tooling and cast samples for review.

  4. Tooling confirmation

    Review and confirm the tooling.

  5. Series production

    Produce against the agreed product requirements.

  6. Shipment

    Prepare the castings for the agreed delivery.

Machinery and overhead cranes in the Zhiren workshop

Inside our foundry.

A closer look at the people and place behind your castings.

About Zhiren

Credentials, in full view.

Quality management, industry recognition and university cooperation. Open any document to read the original.

Zhiren ISO 9001 quality-management-system certificate

Quality management

Quality Management System Certification Certificate

ISO 9001:2015

View original
China Foundry Association standard-enterprise certificate

Industry qualification

Standard Enterprise Certificate

China Foundry Association

View original
Zhiren award for contribution to industrial-park development

Enterprise honor

Outstanding Contribution to Park Development

2025 · Nanchang High-tech Industrial Development Zone

View original
Nanchang University materials-science internship-base plaque

University cooperation

Materials Science & Engineering Internship Base

Nanchang University

View original

Open original