Flow-distribution housing
Flow-distribution housing
Casting Processes
We specialize in investment casting (lost-wax casting) for copper-alloy components. Resin-coated sand casting is also available to suit different component designs and production requirements.
Component RFQ requirements
- Passage and port map
- Supply all branches, connections, wall sections, flow directions and the approved 3D/section drawings.
- Route approval
- Confirm whether casting is allowed and identify the baseline machined or fabricated design for comparison.
- Internal access
- Define core/shell removal access, enclosed passages, inspection access and internal-surface acceptance.
- Wetted compatibility
- Specify coolant, loop identity, material/coating/seal set and the customer's written alloy approval.
- Cleaning and leak checks
- Define particle, ion and residue limits, cleaning evidence, leak method/limits and responsible parties.
- Prototype decision
- Set sample quantity, acceptance gates, traceability and any flow-distribution validation before production approval.
From your drawing to shipment.
Six steps, from the first drawing to delivery.
Your drawings
Share the part drawing and your material and quantity requirements.
Product review
Review the drawing and agree on the proposed casting approach.
Initial tooling & samples
Prepare the initial tooling and cast samples for review.
Tooling confirmation
Review and confirm the tooling.
Series production
Produce against the agreed product requirements.
Shipment
Prepare the castings for the agreed delivery.
Inside our foundry.
A closer look at the people and place behind your castings.
About ZhirenCredentials, in full view.
Quality management, industry recognition and university cooperation. Open any document to read the original.
Enterprise honor
Outstanding Contribution to Park Development
2025 · Nanchang High-tech Industrial Development Zone
View original
University cooperation
Materials Science & Engineering Internship Base
Nanchang University
View original