Fire department connection body
Fire department connection body
Casting Processes
We specialize in investment casting (lost-wax casting) for copper-alloy components. Resin-coated sand casting is also available to suit different component designs and production requirements.
Component RFQ requirements
- Inlet and outlet layout
- Identify the external supply function, branch count, orientation, outlet direction and approved drawing.
- Local interfaces
- Specify the exact fire-service connection and pipe-thread standards, engagement and mating parts.
- Clapper and seals
- Define internal closure arrangement, hinge/seat geometry, sealing interfaces and included subassembly parts.
- Mechanical and pressure duty
- State wall sections, connection loading, environmental finish and pressure/leak-test criteria.
- Material and release
- Identify approved casting alloy, delivery condition, batch records and complete-FDC approval responsibility.
From your drawing to shipment.
Six steps, from the first drawing to delivery.
Your drawings
Share the part drawing and your material and quantity requirements.
Product review
Review the drawing and agree on the proposed casting approach.
Initial tooling & samples
Prepare the initial tooling and cast samples for review.
Tooling confirmation
Review and confirm the tooling.
Series production
Produce against the agreed product requirements.
Shipment
Prepare the castings for the agreed delivery.
Inside our foundry.
A closer look at the people and place behind your castings.
About ZhirenCredentials, in full view.
Quality management, industry recognition and university cooperation. Open any document to read the original.
Enterprise honor
Outstanding Contribution to Park Development
2025 · Nanchang High-tech Industrial Development Zone
View original
University cooperation
Materials Science & Engineering Internship Base
Nanchang University
View original