Eccentric bushing
Eccentric bushing
Casting Processes
We specialize in investment casting (lost-wax casting) for copper-alloy components. Resin-coated sand casting is also available to suit different component designs and production requirements.
Component RFQ requirements
- Eccentric geometry
- Part number, inner/outer position, diameters, offsets and machining datums.
- Fits
- Roundness, running clearance at the specified condition and mating shaft dimensions.
- Oil circuit
- Grooves, oil passages, lubricant, oil temperature and supply conditions.
- Condition record
- Wear or burnout location, shaft damage and relevant operating history.
- Material & acceptance
- Specified alloy and standard, supply condition, drawing revision, quantity, inspection criteria and required records.
- Supply form
- Specified sleeve casting blank with rough or finish machining agreed per drawing.
From your drawing to shipment.
Six steps, from the first drawing to delivery.
Your drawings
Share the part drawing and your material and quantity requirements.
Product review
Review the drawing and agree on the proposed casting approach.
Initial tooling & samples
Prepare the initial tooling and cast samples for review.
Tooling confirmation
Review and confirm the tooling.
Series production
Produce against the agreed product requirements.
Shipment
Prepare the castings for the agreed delivery.
Inside our foundry.
A closer look at the people and place behind your castings.
About ZhirenCredentials, in full view.
Quality management, industry recognition and university cooperation. Open any document to read the original.
Enterprise honor
Outstanding Contribution to Park Development
2025 · Nanchang High-tech Industrial Development Zone
View original
University cooperation
Materials Science & Engineering Internship Base
Nanchang University
View original