Circulator pump housing
Circulator pump housing
Casting Processes
We specialize in investment casting (lost-wax casting) for copper-alloy components. Resin-coated sand casting is also available to suit different component designs and production requirements.
Component RFQ requirements
- Pump identity
- Provide model, approved housing drawing, flow-passage geometry and interfaces to the rotating assembly.
- Service category
- Distinguish closed-loop water from domestic hot water; supply actual temperature, pressure and water chemistry.
- Alloy approval
- Specify material standard and condition; for potable service define the required component qualification and responsibility.
- Seals and ports
- Identify gasket seats, registers, connections, machining datums and critical wall sections.
- Delivery acceptance
- State machining scope, leak-test method, limits, batch traceability and any required cleanliness records.
From your drawing to shipment.
Six steps, from the first drawing to delivery.
Your drawings
Share the part drawing and your material and quantity requirements.
Product review
Review the drawing and agree on the proposed casting approach.
Initial tooling & samples
Prepare the initial tooling and cast samples for review.
Tooling confirmation
Review and confirm the tooling.
Series production
Produce against the agreed product requirements.
Shipment
Prepare the castings for the agreed delivery.
Inside our foundry.
A closer look at the people and place behind your castings.
About ZhirenCredentials, in full view.
Quality management, industry recognition and university cooperation. Open any document to read the original.
Enterprise honor
Outstanding Contribution to Park Development
2025 · Nanchang High-tech Industrial Development Zone
View original
University cooperation
Materials Science & Engineering Internship Base
Nanchang University
View original