COMPONENT REQUIREMENTS

Bronze gear blank

Define the geometry, material, delivery condition and acceptance criteria for the selected application. Manufacturing scope requires review of the approved drawing and operating requirements.

Illustrative Bronze gear blank
Generated component illustration. It is not a Zhiren product photograph or an engineering drawing; final geometry follows the controlled drawing.
Illustrative Bronze gear blank
Conceptual part illustration
COMPONENT GUIDE

Bronze gear blank

Auxiliary transmission with a drawing-specified bronze gear or rim.

Provides a blank for subsequent gear machining and assembly.

Manufacturing & delivery form
Cast solid or ring blank with agreed premachining; tooth cutting specified separately.

Assess a bronze gear blank only when the approved transmission drawing specifies bronze; other gear materials require a separate scope.

Material candidates

UNS C90500 Tin bronze

Candidate for drawing-defined gear blanks and selected lubricated components.

Confirm the governing standard, casting form and duty. C90500 and C90700 are distinct grades.

UNS C90700 Tin bronze

Candidate for gear and worm-wheel blanks.

Confirm the mating gear, lubrication and machining scope. An alloy designation does not establish finished gear accuracy.

Confirm the drawing, actual duty, material standard and manufacturing condition. Material substitutions require customer approval, and supply scope is agreed after component review.

Component RFQ requirements

Blank geometry
Rim/hub arrangement, bore, outside diameter and casting envelope.
Machining definition
Datums, stock allowance, tooth-machining responsibility and final inspection scope.
Mating design
Connected hub and mating gear or worm drawing.
Drive duty
Load, speed, lubricant and required hardness condition.
Material & acceptance
Specified alloy and standard, supply condition, drawing revision, quantity, inspection criteria and required records.
Supply form
Cast solid or ring blank with agreed premachining; tooth cutting specified separately.

Start with your drawing, specified alloy and quantity. Include the required delivery condition and acceptance records so the manufacturing and inspection scope can be reviewed.

Prepare a component enquiry
FURTHER GUIDANCE

Prepare the technical RFQ.

Alloy reference

Review tin-bronze grades.

Compare reference grades and composition in the alloy catalogue. Use the approved component specification to determine the required alloy and service suitability.

Explore the alloy reference