APPLICATION & COMPONENTS

Facility water & CDU primary side

Start with the facility-water circuit and the customer's actual pump, valve, filter and distribution drawings.

Generated application context: Facility water & CDU primary side
Data Center Liquid Cooling

Locate the part.
Define the requirements.

Select a component group below.

For CDU and facility-cooling OEM teams defining candidate components on the facility water system (FWS). Confirm water quality, operating conditions and every wetted material before assessing a copper-alloy route.

Generated images illustrate the context and component categories. They are not Zhiren project photographs or engineering drawings.

Select a group. Identify your part.

Choose a component to view its function, material candidates and drawing requirements.

Illustrative component locations: Pump housing study

Numbered locations identify component-family examples. Illustrations do not define dimensions, material grade or interchangeability.

All component guides in this application 4 component entries

Open a guide directly, including parts from the other equipment groups.

FURTHER GUIDANCE

Prepare the technical RFQ.

Alloy reference

Review tin-bronze grades.

Compare reference grades and composition in the alloy catalogue. Use the approved component specification to determine the required alloy and service suitability.

Explore the alloy reference