COMPONENT REQUIREMENTS

Pump wear ring

Define the geometry, material, delivery condition and acceptance criteria for the selected application. Manufacturing scope requires review of the approved drawing and operating requirements.

Illustrative Pump wear ring
Generated component illustration. It is not a Zhiren product photograph or an engineering drawing; final geometry follows the controlled drawing.
Illustrative Pump wear ring
Conceptual part illustration
COMPONENT GUIDE

Pump wear ring

Impeller-to-casing clearance interface

Provides a replaceable ring at a drawing-defined pump clearance.

Manufacturing & delivery form
Ring casting or suitable tube/bar blank followed by machining; route to be agreed.

This is not a mechanical-seal face ring. Material selection includes the mating ring and operating clearance.

Material candidates

UNS C95800 Nickel aluminium bronze

A candidate for specified saline-water and wear components.

Candidate for drawing review only. Review water chemistry, flow, mating metals and casting condition; no corrosion or cavitation guarantee. Zhiren availability is unconfirmed.

UNS C90500 Tin bronze

A candidate for drawing-specified pump, valve and friction components.

Candidate for drawing review only. Confirm medium, loading, manufacturing condition and the governing standard. Zhiren availability is unconfirmed.

Confirm the drawing, actual duty, material standard and manufacturing condition. Material substitutions require customer approval, and supply scope is agreed after component review.

Component RFQ requirements

Ring geometry
Inside/outside diameters, width, steps and retention arrangement.
Clearance & pair
Cold/hot design clearance, mating material, hardness and temperature.
Machining
Roundness, concentricity, surface finish, allowances and final inspection.
Material specification
Alloy grade, governing standard and revision, manufacturing condition and any restricted substances.
Order & acceptance
Approved drawing revision, quantity, blank or machined delivery, inspection criteria and required records.

Start with your drawing, specified alloy and quantity. Include the required delivery condition and acceptance records so the manufacturing and inspection scope can be reviewed.

Prepare a component enquiry
FURTHER GUIDANCE

Prepare the technical RFQ.

Alloy reference

Review tin-bronze grades.

Compare reference grades and composition in the alloy catalogue. Use the approved component specification to determine the required alloy and service suitability.

Explore the alloy reference