Review tin-bronze grades.
Compare reference grades and composition in the alloy catalogue. Use the approved component specification to determine the required alloy and service suitability.
Explore the alloy referenceDefine the geometry, material, delivery condition and acceptance criteria for the selected application. Manufacturing scope requires review of the approved drawing and operating requirements.
Drawing-defined replaceable clearance interface between impeller and casing
Provides the specified replaceable ring at a pump running-clearance interface.
Manufacturing & delivery form
Ring-shaped casting blank or machined bar/tube stock, as agreed.
A pump wear ring is not a mechanical-seal face ring. Material, clearance and mating surfaces must be reviewed together, including standby duty.
Start with your drawing, specified alloy and quantity. Include the required delivery condition and acceptance records so the manufacturing and inspection scope can be reviewed.
Prepare a component enquiryCompare reference grades and composition in the alloy catalogue. Use the approved component specification to determine the required alloy and service suitability.
Explore the alloy reference